Ending extreme hunger
In several conflict-affected regions, estimated at about $7–10 billion a year.

From reactive audit to preventive integrity. An estimated 15–25% of the UN system’s operating resources is absorbed by structural inefficiency — roughly $25–35 billion over the past decade. GARI proposes an independent, preventive third line of defence that finds the leakage before the money is gone, not after.
Recurring arrears, volatile cash flows and repeated cash-conservation measures point to a financial model that is structurally vulnerable — and to inefficiency the system can no longer absorb.
GARI estimates from comparative modelling of organisational and financial flows, benchmarked against similar multilateral organisations. They describe the systemic cost of a fragmented, reactive model — not widespread fraud, and not an audit finding.
Every dollar lost to structural inefficiency is a service someone did not receive.
In several conflict-affected regions, estimated at about $7–10 billion a year.
Primary education and basic health services for tens of millions of children in low-income countries.
Stockpiles and faster distribution of vaccines and medical equipment.
Agencies with less duplication that deploy help sooner.
Every optimisation means more food, clothing and healthcare reaching people in need — and reaching them sooner. And when Member States can see each contribution traced to a result, voluntary contributions can grow: confidence is what turns one-off pledges into sustained funding. The same evidence base attracts sponsorship from technology companies, which back what they can measure.
Illustrative estimates derived from the figures above: ~$9.5–9.7B a year in regular and peacekeeping budgets; an estimated annual loss of $2.5–3.5B (one tenth of $25–35B over ten years); and voluntary funding of tens of billions a year. They show order of magnitude, not a forecast.
OIOS and the Board of Auditors are essential, but the model is reactive, sample-based and annual. Without continuous monitoring, risk is found after the fact.
A decade of managerial reform has not cut administrative cost proportionally. Overlaps persist and recommendations are implemented slowly. Change run only by the structures that created the problem rarely changes the structure.
When reform pressure rises, energy shifts to protecting positions and limiting personal risk. It is a universal organisational pattern — and the reason an independent, objective mechanism is needed.
The UN does not lack reports, reviews or reform plans. It lacks change that is finished, measured and owned.
| Business as usual | GARI |
|---|---|
| Open-ended contracts that grow with every phase | Fixed scope and a defined exit — 7–12 months end to end |
| Advisers paid to stay: implementation follows review, review follows implementation | We train staff, hand over and leave. Success is becoming unnecessary |
| Audit after the fact — sample-based, annual | Continuous, preventive monitoring that catches risk while it can still be stopped |
| Generic “best practice” templates copied from one institution to the next | Models calibrated to the institution’s own record, tested on a digital twin first |
| Recommendations measured in pages delivered | Every recommendation tied to an indicator, measured in services delivered |
| Reform run by the structures that created the problem | Independent, non-partisan capacity with no stake in the outcome beyond results |
| Accountability diffused across committees | Each decision tied to a named role, with a traceable record from allocation to outcome |
| Risk-averse, slow, defensive | Determined, results-driven — people who move things |
| Vendor lock-in and proprietary dependency | Legal ownership of every solution transfers to the institution on delivery |
| Political exposure for leadership | Analysis, not verdicts — no blame, no public judgement |
| Savings promised | Savings shown: 36% OPEX optimisation, 41 contracts renegotiated, $1.33M risk avoided in a comparable institution |
| ★ Diagnostic first year, plan second year, results “next biennium” | First measurable results within one budget cycle |
| ★ Cost of the review often exceeds what it recovers | Engagement priced against what it frees up for programmes |
| ★ Overhead absorbs the contribution before it reaches the field | More of every dollar reaches food, shelter and healthcare |
| Donor fatigue: pledges shrink when results can’t be shown | Traceable outcomes that turn one-off pledges into sustained funding |
| ★ Technology companies hesitate to back programmes they cannot measure | Evidence-based results that attract sponsorship from the technology sector |
| ★ The same findings in every audit cycle, year after year | Findings closed, verified and kept closed by control points |
| Data in silos, reconciled by hand at year end | One traceable source, visible in near real time |
| Parallel agencies duplicating functions and overhead | Consolidation by function, unified budgets, one owner per line |
| ★ Change waits for consensus that never arrives | Phased pilots that prove value first, then scale with consent |
| Headcount grows with complexity | Staffing modelled on what the mandate actually needs |
| Technology bought first, process fixed later (or never) | Process and accountability first, technology to serve them |
| Big-bang transformations that disrupt services | Zero-downtime transition: services to beneficiaries continue throughout |
| ★ Reform as a communication exercise | Reform as an operating change, measured in KPIs |
| Consultants who need the problem to stay | An institute that wants the problem solved |
| Member States asked to trust | Member States shown the evidence |
★ highest-impact differences
Business as usual is paid by the hour. GARI is measured by what reaches the people the UN serves.
Before any engagement, GARI runs a pre-screening from public data and comparative benchmarks. This is the minimum matrix — 17 areas, 110 subdomains — and each engagement extends it to the institution’s own mandate. These are the areas with the highest likely return: hypotheses to test, not findings.
| # | Area | Subdomains | What we would test | Deliverable |
|---|---|---|---|---|
| ★ 1 | Duplication and merge opportunities | 9 HR, finance, procurement, ICT, legal, communications, travel, facilities, entities and offices | Overlapping functions, mandates and entities that could be merged | Duplication map with merge and consolidation scenarios |
| ★ 2 | Friction between departments and entities | 6 handoffs, conflicting mandates, shared-service agreements, internal cost recharges, data exchange, cross-entity escalation | Where work stalls between units, who waits for whom, and at what cost | Friction map with hotspots, cost of delay and resolution model |
| ★ 3 | Procurement and vendor portfolio | 7 sole-sourcing, framework agreements, supplier overlap, licences, consultancy, logistics, contract renewals | Fragmented contracts, repeat sole-sourcing, unused licences | Contract portfolio register with renegotiation and termination shortlist |
| ★ 4 | Audit recommendations left open | 5 OIOS, Board of Auditors, JIU, internal audit, evaluation offices | Findings repeated across cycles, age of open items | Open-findings heatmap with root causes and control fixes |
| ★ 5 | Delegation, approvals and decision latency | 7 delegation of authority, approval process design, budget release, hiring approval, procurement approval, travel, grants | Number of sign-offs, request-to-decision time, unclear delegation | Delegation map and redesigned approval routing with time targets |
| 6 | Grade structure and span of control | 5 grade distribution, layers, spans, vacancies, temporary positions | Senior-to-delivery ratios, low-value layers | Structure model with optimal spans and staffing scenarios |
| ★ 7 | Liquidity and cash management | 6 arrears, cash conservation, trust-fund balances, reserves, payment timing, currency exposure | Idle balances and cash-flow volatility | Liquidity profile and cash-planning model |
| 8 | Travel, events and consultancy | 6 travel class and frequency, conferences, events, studies, consultants, translation | Spend versus outcome, repeat studies on the same topic | Quick-win list with savings estimate |
| 9 | ICT estate | 7 ERP instances, parallel systems, hosting, licences, cybersecurity, service desks, data centres | Duplicated platforms and licences | ICT rationalisation roadmap |
| ★ 10 | Data and reporting | 6 KPI definitions, reconciliation, dashboards, data quality, master data, results reporting | Manual reconciliation, inconsistent KPIs | Single KPI framework and data-flow blueprint |
| 11 | Field delivery chain | 7 supply chain, implementing partners, last-mile delivery, cash transfers, overheads, delivery time, monitoring | Share of each dollar that reaches beneficiaries | Cost-to-beneficiary analysis per delivery channel |
| 12 | Earmarked versus core funding | 5 earmarking levels, pooled funds, reallocation rules, reporting burden, donor conditions | Rigid allocations that block reallocation | Funding flexibility assessment and options paper |
| 13 | Real estate and common premises | 8 office occupancy, leases, shared premises, utilities, security, maintenance, fleet, common services | Under-used offices, separate premises in the same city | Premises consolidation plan with savings estimate |
| ★ 14 | Accountability and real-time control | 7 accountability chains (RACI), real-time audit, automated notifications and alerts, derogations, exception management, segregation of duties, control points | Who owns each decision, how exceptions and derogations are approved and tracked, how fast deviations are flagged | Accountability matrix, real-time control design and derogation and exception register |
| ★ 15 | People, skills and performance | 7 hiring process, real impact of performance management, skills matrix, staff allocation to priorities, workload balance, learning, mobility | Time-to-hire, whether performance ratings link to results, skills versus mandate needs | Skills matrix, allocation model and performance-to-impact framework |
| 16 | Quality and re-work | 6 re-work management, quality management, error rates, first-time-right, document review cycles, service standards | How much work is done twice and why | Re-work cost analysis and quality management framework |
| ★ 17 | Risk and issues management | 6 risk register quality, risk appetite, issue log, escalation paths, mitigation tracking, lessons learned | Whether risks have owners and triggers, whether issues close or recur | Integrated risk and issue register with owners, triggers and escalation rules |
| Total: 17 areas · 110 subdomains · 17 deliverables | ||||
★ highest expected return
Outcome: in about four weeks, a ranked list of 10–15 opportunities, each with an estimated value, an owner and a first indicator. It becomes the starting point of Phase 1.
Clear rules, agreed up front, so the work moves forward and ends on time.
Structured interviews with the people who own the mandate, the budget and the processes.
Where participation is missing, GARI proposes the best solution the evidence supports — the work does not stop.
Each deliverable arrives as a first version, then calibration workshops with the teams that will use it.
Comments are implemented and the next review covers only those changes. The result is v1 — no endless review loops.
Regular sessions with Member States to explain the purpose, show progress against indicators and answer questions — transparency from the first week.
One smaller agency first, as the pilot.
The system, the methodology and the customised AI engine are calibrated on real data and real workflows.
Once calibrated and proven, the model scales across the system — faster, and at lower cost per entity.
Measured results in 7 to 12 months — depending on data access, sponsorship and decision speed.
Pre-screening Mobilisation Diagnostic Redesign Control & live pilot Handover ◆ decision gate ● Member State briefing
| Stage | What happens | Deliverable |
|---|---|---|
| Pre-screening | Public budgets, OIOS and Board of Auditors reports, structures and mandates; minimum matrix (17 areas, 110 subdomains) against benchmarks; value per area | 10–15 ranked opportunities, pilot proposal and sponsor brief |
| Mobilisation | Engagement agreement, data-sharing and security approvals, named sponsor and counterparts, rules of engagement | Signed scope, data access, interview plan |
| Phase 1 · Diagnostic | Assessment interviews, baseline measures, friction, duplication, risks and open findings | Agreed baseline; diagnostic report v0 → calibration workshop → v1 |
| Phase 2 · Redesign | Delegation and approvals, accountability (RACI), reallocation scenarios, workflows, skills and allocation | Delegation map, accountability matrix, scenarios approved by the sponsor |
| Phase 3 · Control & live pilot | Real-time audit, alerts, exception and derogation management; live operation; AI engine calibrated on real data | Control design, exception register, interim results against baseline |
| Phase 4 · Handover | Zero-downtime transition, staff training, KPIs measured, lessons learned, formal handover | Final v1, leadership dashboard, impact report |
An independent technical capacity that complements OIOS and the Board of Auditors — it does not replace them.
Every financial flow observed as it happens, not sampled once a year.
Anomalies, duplications and irregular patterns flagged across agencies and systems.
Risk surfaces while it can still be stopped, with a clear owner for each alert.
Each decision and approval tied to a named role, with a traceable record from allocation to outcome.
Grouping by functional area, with unified budgets and responsibilities.
Optimal positions and decision-to-implementation ratios modelled mathematically; standard structures and control points.
Automated SOPs, control points at critical decisions, continuous monitoring and traceability.
Centralised, standardised and fully traceable.
Precise job descriptions, measurable KPIs and continuous performance evaluation.
Every change tied to indicators, so progress is shown, not asserted.
Not another consultancy cycle. A focused, independent team that comes in to deliver measurable results — and is gone when the job is done.
The Execution Method™ is already measured in a comparable international institution: 36% OPEX optimisation, 41 contracts renegotiated, $1.33M in risk avoided.
No political judgement, no blame, no agenda. We deliver analysis and execution models — leadership decides.
Fixed scope and a defined exit: 24 weeks of pilot delivery, 7–12 months end to end. We train your staff, hand over and leave — no open-ended implementations, no audits that never end.
Models calibrated to the institution’s own record, and every reform tested on a digital twin before anything changes in real operations.
Every recommendation is tied to an indicator. Success is measured in services delivered and resources freed — not in pages written.
Senior practitioners from international organisations, governments, academia and industry, with a record of delivering under pressure.
Legal ownership of every solution transfers on delivery. Reform can be presented as an internal initiative.
Data is used only for the engagement and never shared; analysis runs in air-gapped or restricted environments when required.
GARI does not claim a complete solution. It brings independent technical capacity, determination and a method that works — so more of every contribution reaches the people the UN serves.
The UN system is losing an estimated 15–25% of its operating resources to structural inefficiency — roughly $25–35 billion over the past decade. Even the low end means billions a year that never reach the people it serves. The cause is not fraud. It is architecture: overlapping functions, reactive audit, fragmented institutions and no real-time view of where money goes.
A decade of reform has adjusted the system without changing it. GARI proposes an independent, preventive third line of defence — continuous algorithmic monitoring that finds leakage while it can still be stopped. Start with one agency, prove the result, then scale.
The UN system manages about $3.5–3.7 billion a year in the regular budget, more than $6 billion in peacekeeping and tens of billions through voluntary funds and agencies. Recurring arrears, repeated cash-conservation measures and pressure on budget execution show a financial model that can no longer absorb waste.
Administrative costs have not fallen in proportion to a decade of reform effort. Overlaps persist, audit remains after-the-fact, and recommendations are implemented slowly and unevenly. Reform run only by the structures that created the problem rarely changes the structure. Deep change needs technical independence.
Duplicated functions. Hierarchical layers that add little to decisions. Slow approvals. Weak preventive controls. Data reconciled by hand instead of seen in real time. Even a 10% reduction would release billions of dollars a year for programmes.
Every dollar lost to inefficiency is a service someone did not receive. Over ten years, $25–35 billion could have helped to:
The Office of Internal Oversight Services and the Board of Auditors are essential. But the model is reactive, sample-based and annual: risk is found after the money has gone. Without continuous monitoring, prevention is impossible.
An independent technical capacity for continuous transaction monitoring, automated risk analysis, early alerting and digital accountability, with every decision tied to a named role. It complements OIOS and the Board of Auditors; it does not replace them.
Reform pressure triggers defensive behaviour: energy shifts from results to protecting positions. This is a universal organisational pattern, not a failing of individuals. An independent, objective mechanism takes the personal risk out of change and keeps the focus on outcomes.
Within one budget cycle, the pilot produces measured results, a calibrated method and a customised AI engine ready to scale.
The method is not specific to the UN. The same Execution Method™, pre-screening matrix and preventive control model apply wherever public money, complex mandates and diffused accountability meet:
Each engagement calibrates the method to its own mandate. The principle stays the same: prevent, measure, hand over.
The UN’s credibility rests on what reaches the people it serves. Prevention, independence and measured results are no longer options — they are conditions of the mandate.
We measure our success by how quickly we become unnecessary — and by how much more reaches the people the UN serves.